Karnataka Clean Mobility Policy 2025–30

Fast charging that
works like a pit stop,
not a parking lot.

ReviveHUB builds destination-grade EV charging hubs — 10 × 200kW DC guns, an amenity lounge, and guaranteed uptime for fleet operators across Karnataka.

EV Charger

The gap we're closing

EV adoption isn't slowing because
of vehicles. It's the charging.

India has millions of EVs on road. The infrastructure hasn't caught up — chargers are underpowered, unreliable, or buried in parking basements with no amenities.

Fragmented, slow chargers

Most public chargers offer 7–22kW AC — 4 to 8 hours per charge. Drivers avoid long trips entirely.

Dead zones on key corridors

National highway corridors lack reliable 100kW+ charging, creating range anxiety that suppresses commercial fleet adoption.

Fleet operators stranded

Bus, cab, and logistics fleets can't commit to EVs without guaranteed, fast, high-uptime charging on their daily routes.

ReviveHUB's answer

Destination hubs planned around fleet demand — 200kW guns, lounge, canopy, 30-min turnaround. Charging as a feature, not a friction point.

The ReviveZone Hub

Built like a destination.
Runs like infrastructure.

Every ReviveZone is purpose-built: covered bays, 200kW guns, a driver's lounge, and an OCPP-connected backend for real-time fleet management.

ENTRY 200kWBay 1 200kWBay 2 200kWBay 3 200kWBay 4 200kWBay 5 DRIVE LANE 200kWBay 6 200kWBay 7 200kWBay 8 200kWBay 9 200kWBay 10 Driver Lounge WiFi · Café · Rest EV SERVICE BAY Available In use 10 guns total

10 × 200kW DC fast chargers

CCS2 + Type-2 AC. Serves cars, buses, and LCVs simultaneously.

Amenity lounge

Café, washrooms, rest zone, Wi-Fi — drivers stay on-site during the 30-min charge window.

HT DISCOM connection

2MW+ sanctioned load. Grid-direct, no shared supply constraints from residential feeders.

OCPP smart backend

Real-time availability, remote diagnostics, fleet billing APIs, and CMS dashboard.

32,000 sqft footprint

Covered canopies, queuing lanes, dedicated fleet parking bays, and an EV service area.

Who we work with

Two partners. One network.

Fleet operators anchor our demand. Franchise investors build our hubs. Both win when a ReviveZone goes live.

Fleet Operators
Priority fleet bays · SLA-backed uptime

Guarantee charging
for your fleet

Cab, bus, and logistics fleets — lock in priority slots, get fleet billing, and never leave a vehicle stranded mid-route.

  • Priority bay allocation during peak hours
  • Single monthly fleet invoice via billing API
  • 99.5% uptime SLA commitment
  • Fleet manager dashboard with live availability
  • Multi-city expansion aligned to your routes
Franchise Investors
Y1 Y2 Y3 Y4 Y5 Payback

Own a ReviveZone hub
in your city

You bring the land or lease. We bring the tech, brand, DISCOM relationship, and fleet demand pipeline. Revenue from month one.

  • ₹5–8Cr total CAPEX per hub (chargers + civil)
  • 4–5 year payback at 70% utilisation
  • Revenue: energy margin + lounge + ad inventory
  • Centralised OCPP CMS managed by ReviveHUB HQ
  • End-to-end DISCOM application support included

Unit economics snapshot

The numbers work at scale.

Per-hub projections at steady state. Full model available in the investor deck.

Total CAPEX per hub₹5–8CrChargers + civil + lounge
Energy revenue / day₹1.2L+At 70% utilisation, 10 guns
Target EBITDA / year~₹2CrEnergy margin + lounge
Payback period4–5 yrsConservative utilisation case
Charger uptime SLA99.5%Fleet contract commitment
Energy tariff spread₹4–6/kWhNet margin over DISCOM buy rate

From deal to day 1

Hub launch: 9–12 months.
DISCOM connection starts on Day 1.

Every ReviveZone follows a structured critical path. The HT power sanction is the longest lead item — we file it on the day of signing.

Month 0–1

Site lock-in & DISCOM application

Land lease finalised. HT power sanction application filed immediately — this is the longest lead item on the critical path.

Month 1–3

Civil & canopy construction

Foundation, canopy structure, drainage, cable trenching, and lounge shell work begins in parallel with DISCOM processing.

Month 3–6

Charger procurement & installation

200kW DC dispensers ordered and installed. OCPP backend configured, connected, and load-tested.

Month 6–9

DISCOM energisation

HT connection energised. Full load testing across all 10 guns. Lounge and signage fit-out completed.

Month 9–12

Launch → fleet onboarding

Anchor fleet partners go live first. Public access follows via ReviveHUB app and QR-based sessions.

Get in touch

Partner with ReviveHUB

Fleet operator, franchise investor, or a landowner with a strategic site? Tell us more.